Finished units lined up inside the production hall

About CNBoxHome

A single production line, a fixed set of checks, and a cabin signed off before it is dispatched.

Our Story

One Production Line

Frames are cut, welded, ground and powder-coated in our own plant before panels, wiring and interior finishes go on.

Rated for Extremes

Cabin members are sized around sea-container freight, giving a frame rated for magnitude-8 and force-12 loads.

Checked Before Dispatch

Every cabin is checked against its own build sheet — frame steel, base dimensions, doors, windows, wiring and the water test.

Opened on Arrival

The folding body is delivered closed and opens into a complete room; nothing structural is left for the buyer's crew to erect.

Our Story

We are a research, production and sales company working in integrated housing. Our main output is galvanised-steel framed accommodation: double-wing expansion units, standard folding houses, prefabricated container houses and bespoke container builds.

Our production standard is set above the domestic and international standards we are measured against, and the parts we make are sized around sea containers rather than around the drawing board. Frames, floors, plumbing, wiring, doors, windows and bathroom fittings are installed on the line; the roof is waterproofed in two separate layers with corrugated sheet between them.

We control the work in twelve inspection steps before dispatch, including a full electrical test, a live water test and a final folded-and-wrapped check. That is how a unit arrives complete enough to be lived in almost as soon as it is unfolded.

Manufacturing & Quality

Twenty-two production steps, twelve inspection gates, and two waterproof layers on every roof.

22-step production process

1. Material selection 2. Cutting 3. Welding 4. Frame assembly 5. Grinding 6. Baking and coating 7. Sub-assembly 8. Floor laying 9. Drilling and wiring 10. Wall panels 11. Plumbing rough-in 12. Floor installation 13. Partition installation 14. Doors and windows 15. Bathroom fitting 16. Electrical installation 17. Ceiling panels 18. First waterproof layer 19. Corrugated sheet 20. Second waterproof layer 21. Film wrapping 22. Dispatch

12-point factory inspection

  • Configuration check against the order
  • Frame section thickness
  • Side frame width and length
  • Base frame length and width
  • Entrance door
  • Windows
  • Bathroom
  • Whole-unit inspection
  • Electrical circuit test
  • Live water test
  • Fittings and accessories
  • Folded and wrapped condition

Send Us the Project Brief

Send us the location, the delivery date and the number of cabins, and we will return a full specification and a quotation within one business day.

Let's Talk!